Other Geologic Evaluation Projects

  1. Imambekirli (Silifke) Barite Project.
  2. Ilyasalan (Balikesir) Mercury Mineralization.
  3. Kale (Develi, Kayseri) Zinc-Lead Mineralization.
  4. Karapazar (Eskişehir) Marble Project.
  5. Seyit (Artvin) Copper-Zinc-Lead Mineralization.
  6. Bolkar Gold-Silver-Lead-Zinc Mineralization.
  7. Bakırtepe (Sivas) Gold Mineralization.
  8. Deveci Iron Project
  9. Gurbet Hamlet Copper Mineralization.
  10. South of Sivrice (Elazig) Prospecting Report.
  11. North of Kovancılar (Elazıg) Prospecting Report.
  12. Pınarbaşı (Kayseri) and Aladağ (Adana) Chrome Deposits Reserve Report
  13. Pınarbaşı (Kayseri) and Aladağ (Adana) Chrome Deposits Database Report
  14. Fugla Tepe (Orhaneli) Chrome Deposits Reserve Preliminary Investigation Report
  15. Fugla Tepe (Orhaneli) Chrome Deposits Reserve Investigation Report
  16. Kirkpavli (Gumushane) Lead-Zinc Mineralization
  17. Değirmen Ocak, Sarıcaalan Ocak (Denizli) Chromium Geology Preliminary Evaluation Report
  18. Aladağ chrome, Horzum zinc (Adana) Deposit Review Trip Report
  19. Delikkaya, Tekneli, Çadırkaya Zinc Lead Deposits Reserve Report
  20. Delikkaya, Tekneli, Çadırkaya Zinc Lead Deposits Database Report
  21. Horzum Zinc Deposit
  22. Rehova (Albania) Copper Deposit Reserve Investigation Report.
  23. Evaluation Report Based on Existing Reports On Horzum Zinc Deposit (Written Before The Survey).
  24. Aladağ Chrome Exploration Drilling Recommendation Report.
  25. Fugla (Orhaneli) Chrome Field Drilling Exploration Recommendation Report
  26. Preliminary Geological Assessment Report of Orhaneli-Göynükbelen, Harmancık-Ilıcaksu and Simav-Dağardı Chrome License Areas (May 2007).
  27. Geological Preliminary Assessment Report of The Chrome License Areas of Balaban Tepe (Yahyalı-Kayseri), Çatalçam (Yahyalı, Kayseri), Yapraklı (Aladağ, Adana) (May 2007).
  28. Horzum Zinc Deposit (Kozan, Adana) Mine Geology Study Report (May 2007).
  29. Preliminary Geology Assessment Report of Karaabalar (Kofçaz, Kırklareli) Mining License (June 2007).
  30. Evaluation Report Based on the Available Resources (June 2007) Indicating That There are No Mineral Assets In The Plots F31C1,4,D2,3, F36 C1,2,,3,4,D2,3 in Kastamonu and Samsun Regions.
  31. …. Preliminary Geological Assessment Report of the Chrome Field (Aktaş Village-Hafik, Sivas) with Mining License Number (August 2007).
  32. Preliminary Geological Assessment of Chrome Field with Mining License Number AR.200707643 Near Tahtakemer Village (Tomarza, Kayseri) (August 2007).
  33. AR …. (Access No: …..) Preliminary Evaluation of the Mining Potential of the Mining License Area (Şekersu, Çaykara, Trabzon) in the Light of Available Data (September 2007).
  34. …. Evaluation Report of Mining License Area with Access Number (Havran, Balıkesir) (Tepeoba Copper-Molybdenum Deposit) (September 2007).
  35. Sülüklüköy (İnegöl, Bursa) Antimony-Gold and Manganese Mineralizations (September 2007).
  36. Geological Preliminary Evaluation of Some Chrome Fields in Yeşilova, Tefenni, Gölhisar (Burdur) Regions. (July 2007).
  37. Sariz (Kayseri); Kangal (Sivas); Preliminary Geological Evaluation of Some Mining License Areas in Gemerek (Sivas) (September 2007).
  38. Yapraklı (Aladağ, Adana) Chrome Field Inspection Trip Report (October 2007)
  39. Preliminary Resource Estimation Of The Immediate Vicinity Of The Kızılyuk (Karsani, Adana) Chrome Quarries. (March 2008).
  40. Preliminary Geological Evaluation Of Some Chrome Fields In Köyceğiz (Muğla) Region (January 2008).
  41. Evaluation report of Kavak (Mihalıççık, Eskişehir), Beyağaç (Tavas, Denizli), Fethiye (Muğla) Chrome Enterprises. (February 2008)
  42. Evaluation Of The Concession Areas In The Eskişehir, Aladağ, Beyağaç; Köyceğiz And Fethiye Regions (Volume 1), Reconnaissance Works On the Chromitite Occurences Within the Concession Areas in Eskişehir and Aladağ (Adana) Region (Project Owner: Türk Maadin Company A.Ş. June 2010)
  43. Evaluation of the Chromitite in The Concession in The Eskisehir, Aladag, Beyagac; Köyceğiz And Fethiye Regions (Volume 2) Mineral Resource Estimate for the Kavak Property (Mihalıççık, Eskişehir, Turkey) Chromitite Deposit (Project Owner: Türk Maadin Company A.Ş. June 2010)
  44. Evaluations Of The Chromities in The Concessions In The Eskişehir, Aladağ, Beyağaç; Köyceğiz And Fethiye Regions (Volume 3) Evaluations Of The Chromitites In The Concessions In The Beyağaç (Denizli), Köyceğiz, Fethiye (Muğla) Areas (Project Owner: Türk Maadin Company A.Ş. June 2010)
  45. Located in the Umurdağı region, northwest of Eşme (Uşak). Preliminary geological evaluation of the mining license areas No. (March 2008)
  46. Horzum (Kozan, Adana) zinc field investigation trip report. (October 2007).
  47. AR in Kuluncak (Malatya). …. and AR. … Preliminary Geological Evaluation of Licensed Areas (August 2007).
  48. Geological Preliminary Assessment of Some Chrome Fields In the Gerdibi (Pozantı-Aladağ) Region (March 2008).
  49. Resource Estimation Study of the South Daskesen (Ganja-Azerbaijan) iron deposit (May 2008).
  50. Gündüzler Village (Eskişehir) …. Evaluation of the Exploration Potential of The Chrome License Area Numbered (June 2008)
  51. Geological Preliminary Assessment of Some Chrome Fields Near Çiftehan (Niğde), Ereğli (Ulukışla, Niğde) and Aladağ (Adana) (July 2008)
  52. Evaluation of the Mining License Chrome Fields of İslahiye (Gaziantep) ….. (July 2008)
  53. Taşköprü (Kastamonu) …. Evaluation of Mining License Chrome Fields (July 2008)
  54. Zekeriya village Derebucak (Konya) …. Chromium Field Geology Preliminary Study With License Number (July 2008)
  55. Ayrancı – Küçükler (Banaz, Uşak) Nickel-Cobalt Geology Report (August 2008)
  56. IR …., (Aladag, Adana); IR … (Skirted, Karaisali, Adana); Preliminary Geological Assessment of Mining License Areas IR … (Horzum, Kozan, Adana) (August 2008).
  57. Kıcak, Aladağ (Adana) ER …, Preliminary Geological Evaluation of Chrome License Areas (August 2008).
  58. Geological Preliminary Assessment of The Chrome License Area AR … to the East of Kalaycık Village (Islahiye, Gaziantep) (September 2008).
  59. Akçesaz, Büyükorhan (Bursa) Preliminary Geological Assessment of Chrome License Areas IR … and AR … (September 2008).
  60. Gurbet hamlet, Yurtbaşı (Elazığ) Exploration Potential of Copper-Zinc Mining License Area IR … (December 2008).
  61. Near Karacalar village (Emirdağ, Afyonkarahisar) …. Geological Preliminary Study of the Travertine License area no. (February 2009)
  62. Sisorta (Koyulhisar, Sivas) Gold Deposit Operation Project and Exploration Activity Report (February 2009).
  63. Geological Assessment of the Chrome License Area Number …  Located at the Northwest of İncesu village (Sorgun, Yozgat) (April 2009)
  64. Geological Preliminary Assessment of the Mining License Number IR … Located near Büyükçakır village (Yahyalı, Kayseri) (April 2009).
  65. Preliminary Geological Evaluations of the Chromitite Occurrences in the Concession (IR…..) near Çamlıca village (Yahyalı, Kayseri, Esatern Turkey).
  66. Preliminary Geological Assessment of Mining License Areas AR … and AR … Located in Acıpayam (Denizli) and Çavdır (Burdur) regions (May 2009).
  67. Preliminary Investigation of Mining License Areas IR 7968, IR 46912, AR …, AR … Near Harmancık and Keles (Bursa) (May 2009).
  68. Treasure cave (Gümüşhane) Polymetallic Mineral Deposit Resource Estimate (May 2009).
  69. Beylikova, Saricakaya (Eskisehir); Tavsanli (Kütahya); Koycegiz (Mugla); Osmaniye; Preliminary Geological Assessment of Mining License Areas with Number …, Near Pozantı (Adana) (June 2009).
  70. Preliminary Study for the Supply of Concrete Aggregate Material in the Eastern Black Sea region (July 2009).
  71. Karataş, Tekman (Erzurum) AR …. Geological Preliminary Assessment of the Numbered Iron License area (August 2009).
  72. Preliminary Assessment of Mining License Areas … and … near Kızılkaya and Evrenli Villages (Mersin) (September 2009).
  73. Bicir, Kuluncak (Malatya) Evaluation of the Exploration Potential of the Mining License Area IR … (November 2009).
  74. Terek (Kyrgyzstan) Antimony-Gold Deposit Resource Estimate (November 2009)
  75. Resource estimation of the Koyulhisar Lead-Zinc Deposit (Sivas, Eastern Turkey).
  76. Resource Estimation and Exploration Potential of the Lignite Deposit in the Thrace, Northwestern Turkey.
  77. Evaluation Report on Geothermal Fields Suitable for Electricity Generation in Turkey (2006).
  78. Fugla Chrome Deposit (Orhaneli, Bursa, Western turkey) Open Cast Mine Design.
  79. Dashkesan Iron Ore Deposit (Azerbaijan), Opencast Mine Design.
  80. South Dashkesen Eastern Section Iron Ore Open Pit Project Volume – 1 (Project Owner: Dashkesan Filizsaflastırma ASC, Azerbaijan, Azerbaijan, June 2008)
  81. Eastern Section of Southern Dashkesan Iron Ore Deposit Open Pit Project Volume 1 (Project Owner: Dashkesan Filizsaflastırma ASC, Azerbaijan, June 2008)
  82. South Dashkesen Eastern Section Iron Ore Open Pit Project Volume – 2 (Project Owner: Dashkesan Filizsaflastırma ASC, Azerbaijan Azerbaijan, June 2008)
  83. Open Pit Project In the Eastern Section of Southern Dashkesan Iron Ore Deposit Volume 2 (Project Owner: Dashkesan Filizsaflastırma ASC, Azerbaijan, June 2008)
  84. Eastern Section of Southern Dashkesan Iron Ore Deposit Open Pit Operations Equipment Selection (Project Owner: Dashkesan Filizsaflastırma ASC, Azerbaijan, June 2008)
  85. South Dashkesen East Section Iron Ore Open Pit Project Machinery Equipment Selection (Project Owner: Dashkesan Filizsaflastım ASC, Azerbaijan Azerbaijan, June 2008)
  86. Southwest Dashkesan and Demirov Fields Resource Estimation Report (Project Owner: Dashkesan Filizsaflastirma ASC, Azerbaijan Azerbaijan, June 2008)
  87. Pre-feasibility study of the Deveci (Hekimhan, Malatya, Eastern Turkey) Iron Ore Deposit.
  88. Designing an ADR Plant with a Capacity of 6t Carbon to Supplement Their Existing Plant at Quartzite Gold Plant Near Bolnisi, Georgia.
  89. Evaluation of Gold Prospecting Potential of Alacağzı and Kireçlik Quartz Sand Fields (Kandilli, Karadeniz Ereğli) (Preliminary Report, January 2010).
  90. Preliminary Evaluation of the Chromitite Occurrences Near the Gatherings Village (Concession No: 200809126), Islahiye, Gaziantep, Southeastern Turkey. (October 2009).
  91. …, IR. … Seldiren No. (Arsuz, Antakya) and AR. … Preliminary Geological Evaluation Report of Kördomuz (Işıklı, Çevlik, Antakya) Chrome License Fields (February 2010).
  92. Preliminary Review of The Historical Resource Estimate, Terek Antimony-Gold Property, Kyrgyzstan (March 2010).
  93. Areas Where Aggregate Material Can Be Provided Around Arhavi and Hopa (August 2009).
  94. Preliminary Evaluation Report for Chromium Potential of Mining License Field No. … Near Nalınlar Village (Orhaneli, Bursa) (April 2010).
  95. Teck Madencilik, Çanakkale-Balıkesir License Fields Investigation Report (February 2010).
  96. AR Under license from Teck Comico. Summary Geology and Gold Contents of Silicifications in License Area … (April 2010).
  97. Trip Report to the Eshidiya Phosphate Mine, Southern Jordan (February 2010).
  98. An Evaluation of the Discoverable Coal Resources of the Çeltek Coal Field (June 2009).
  99. Brief Information on Some of the Mineral Deposits and Mineral Occurences Present in Eastern Turkey (marked on the 1/1 000 000 Scale Metallogenic Map of Turkey).
  100. Resource Assessment of the Carbonate-Replacement Style Deposits (CRD) in the Central and Eastern Taurus Belt Towards Targeting Carbonate-Replacement Style Deposit (CRD) Hosting High Grade Silver-Lead-Zinc Mineralizations (Project proposal (March 2009).
  101. Konya Cumra and Mersin Mut License Areas Field Study Report (January 2010).
  102. Investigation Report for Chromium Opportunities of Güveme (Andırın-Kahramanmaraş) and Şekeroba (Türkoğlu-Kahramanmaraş) License Areas (September 2008).
  103. Beylikova, Saricakaya (Eskisehir); Tavsanli (Kütahya); Köycegiz (Mugla); Osmaniye; Geological Preliminary Evaluation Report of Mining License Areas No. …, … Near Pozantı (Adana) (June 2009).
  104. …, … Chromium Evaluation Report of Mining License Fields (Taşköprü-Kastamonu) No. (July 2008).
  105. Evaluation and Investigation Report of 60 Drilling Works in Sivas-Koyulhisar Muradın and Aksu Villages Lead-Zinc-Copper-Silver-Gold Mine Fields (September 2006).
  106. Geological Study of the Lateritic Nickel-Cobalt Mineralization in and Around Dikmen Tepe, Karateke Tepe and Üçbaşlı areas, Near Mihalıççık, Eskişehir, Central Turkey (October 2008)
  107. … Preliminary Geological Evaluation Report of Chrome License Field No. (Orhaneli, Bursa) (April 2009).
  108. Mining Geological Investigation of Sulualan, Tepekuyu and Western Chromium (Orhaneli, Bursa) Chromium Deposits and Near Surroundings (October 2009).
  109. META Nickel Cobalt Inc. Evaluation of Gördes (Manisa) Nickel Project Feasibility Report (March 2010).
  110. Operation Project of Karatepe-Kovanlık License Area No. IR-58467 in Çanakkale Province, Lapseki District (May 2010).
  111. Operation Project of Kestanelik IR-… License Area in Lapseki District of Çanakkale Province (May 2010).
  112. Operation Project of Karaayi IR-58368 License Area in Çanakkale Province, Lapseki District (June 2010).
  113. IR in Orhaneli Region…. Resource Estimation Report of the Irrigated Chromitite Deposit in License Area No. (July 2010).
  114. … Preliminary Evaluation Study of the Mining License Area with Accession Number [Şahinkaya (Tanar), (Kahramanmaraş)] (August 2010).
  115. … Preliminary Evaluation Study of Mining License Fields with Access Number (Islahiye, Gaziantep), (September 2010).
  116. Technical Report on Coal Resources Estimate for The Etyemez Property, Kangal, Sivas, TURKEY (Project Owner: Soyak Tam Enerji Yatırım, June-2010).
  117. Cengiz-Old Tent and Burhan-Çakır Quarries (Karaağız, Büyükorhan, Bursa) Geological Survey Report for License Area No. IR–….
  118. Ortaoluk (Soğukoluk, Aladağ, Adana) Chrome License Field Volume 1A, Resource Estimation Report (Project Owner, Demir Export, February 2011)
  119. Ortaoluk (Aladağ, Adana) Chrome Deposit Volume-1B, Ordinary Kriging Resource Estimation Report (Project Owner, Demir Export, February 2011)
  120. Ortaoluk Chrome Field Project, Located in Adana, Aladağ, Volume II Mining Scoping Study (Project Owner, Demir Export, May 2011)
  121. Ortaoluk Chromium Field Project in Adana, Aladağ, Volume III Ore Preparation and Enrichment Scoping Study (Project Owner, Demir Export, May 2011)
  122. Ortaoluk Chromium Field Project in Adana, Aladag, Volume IV Auxiliary Facilities Scoping Study (Project Owner, Demir Export, May 2011)
  123. Ortaoluk Chromium Field Project in Adana, Aladağ, Volume V Economic Analysis (Project Owner, Demir Export, May 2011)
  124. Rare Earth Elements (Rare Earth Elements) Sampling and Study, ESKİŞEHİR
  125. Kizilcaoren (Central Turkey) Rare Earth Element Deposit (March 2012)
  126. Why Explore Rare Earth Element Deposits in Turkey? (March 2012)
  127. Petrography, Mineralology and Chemica Compositions of the Samples from the Kızılcaören Fluorite-Barite-REE Deposit in Turkey, (Prepared by Yasushi Watanabe, Hideo Hirano and Maiko Tsunematsu. December 2011)
  128. Bursa, Orhaneli, IR–… Chrome Field, South of Sulualan, Mining Open Pit Design
  129. Belen, Kirazlı, Çanakkale Sampling Geological Preliminary Study.
  130. Preliminary Geological Evaluation of Chromitite Formations (AR:…) in the South of Aksaz District (Karaçam Village, Köyceğiz, Muğla).
  131. Geological Preliminary Evaluation of the Mining License Area No. … and … in the North of Fethiye (Muğla) in terms of Chromium potential. (Well, Galleries, Erentepe regions)
  132. Evaluation of Chromitite Potential of The Sivişli and Waterfall (Şirlek) Deposits Within The İR…. Concession In Gerdibi Area (Aladağ, Adana)
  133. Review of Exploration Studies on Erzurum Hacımeter Copper Mineralization
  134. Semdinli, Hakkari Geological Preliminary Study and Sampling Study (Base Elements)
  135. Yeşilova, Burdur Region ER … Preliminary Geological Evaluation of License Area in Terms of Chromium Potential
  136. Mevlütler Village (Acıpayam, Denizli), Selçuk Bey-2 Chrome Quarries, (IR–…) Geological Survey Report
  137. Kütahya (Gediz), Cebrail Antimony Field 1/5000 Scale Geological Mapping Study.
  138. Kütahya (Gediz), Cebrail Antimony Field 1/1000 Scale Geological Mapping Study.
  139. Etyemez Coal Project Drilling Study, (Project Owner: Soyak Tam Energy Investment, 2011).
  140. Etyemez Coal Project Open Pit Feasibility Study (Etyemez, Kangal and SİVAS), (Project Owner: Soyak Tam Energy Investment, June-2012).
  141. Preliminary Geological Evaluation of Aşağı Yiğitler Mevkii (Şemdinli, Hakkari) Mine Site (Project Owner; DIMİN Madencilik, April 2011)
  142. Report On the Results of Geological Mapping and Surface Sampling Of The Orucpinar (Ortakoy, Çorum, Central Turkey) Manganese Mineralization
  143. Preliminary Geological Evaluation of Manganese and Copper Potentials of the Concession Areas (AR: …), North of Hafik, Sivas, Central Turkey
  144. Short Report on Valuation of Sandalcık Chromite Property, Acipayam, Denizli, SW Turkey
  145. Exploration Potential of Belen Property, Ezine, Çanakkale, NW Turkey (Project Owner DAMA Mühendislik-Tech Mining, April 2013)
  146. Çanakkale Ezine-Belen Mine Site Geophysical Resistivity/Ip Study, (Prepared by Zeta Proje, November 2011)
  147. Çanakkale Ezine-Belen Field Geophysical Ip/Resistivity Study (Prepared by Zeta Proje, November 2012)
  148. Exploration Potential of Copper Prospect, Belen Property, Ezine, Çanakkale, Nw Turkey (Project Owner DAMA Mühendislik-Tech Mining, April 2013)
  149. Stream Sediment Geochemical Study of the Concession ER…. and ER….., Belen Village (Ezine, Çanakkale Western Turkey) (Project Owner DAMA Mühendislik-Tech Mining, April 2013)
  150. 2011-2012 Akdeniz Mining Drilling program (Project Owner: Akdeniz Madencilik 2011-2012)
  151. Diamond Drilling Assessment, Cebrail Antimony Property, (Gediz, Kütahya, Western Turkey), (Project Owner SUDA Maden A.Ş., May, 2012)
  152. Comparison of 3d Geophysical Model and Drilling Data Created Using Geophysical Resistivity and Chargeability Profile Column Data (Project Owner SUDA Maden A.Ş., September, 2012)
  153. IR…. Geological Preliminary Evaluation of Antimony Mineralization of Karaahmetçalı and Deliktaş Fields in License Area No. (Gabriel, Gediz, Kütahya) (Project Owner SUDA Maden A.Ş., June, 2012)
  154. Geology of the Çambitentaş-Tekçam and Sivriyayla Antimony Deposits (Cebrail, Gediz, Kütahya, NW Turkey), Located Within the İR. … Concession (Revision, June 2012) (Project Owner SUDA Maden A.Ş., June, 2012)
  155. Geology of the Concession IR…. (Oğrulca-Küçük field), East of Uğurluca Village (Gediz, Kütahya, Western Turkey) (Project Owner SUDA Maden A.Ş., October, 2012)
  156. Stream Sediment Geochemical Study of the Concession İR…., North of Cebrail Village (Gediz, Kütahya Western Turkey) (Project Owner SUDA Maden A.Ş., October, 2012)
  157. Technical Report On The Initial Mineral Resource Estimate For The Cebraıl Project Gedız, Kutahya, Turkey (Project Owner SUDA Maden A.Ş., October, 2012)
  158. Results Of The 2012 Drilling Program, Cebrail Antimony Roperty (Gediz, Kütahya, Western Turkey) (Project Owner SUDA Maden A.Ş., March, 2013)
  159. Exploration Potential Of The Cebrail Antimony Project Near Gedız, Kutahya, Western Turkey (Project Owner SUDA Maden A.Ş., March, 2013)
  160. Technical Report And Mineral Resource Estimate for the Cebrail Antimony Property Gediz Area, Kutahya Province, Republic of Turkey Prepared in Accordance with National Instrument 43-101 (Canada) (and accompanying documents 43-101.F1 and 43-101.CP) (Project Owner SUDA Mining A.Ş., May, 2013)
  161. Kestanelik Scoping Study Report (Project Owner, Batı Anadolu Madencilik A.Ş, (Chesser Resources), January, 2013)
  162. Chesser Kestanelik Au Property Pit Optimization By Whittle (Project Owner, Batı Anadolu Madencilik A.Ş, (Chesser Resources), January, 201
  163. Technical Report (Main Investment and Operating Cost Calculation for Denis and Evciler Region Mining Activities) (Project Owner: Limak Energy Group, August, 2012)
  164. Seyitömer Lignite Field Evaluation and Technical Report (Project Owner: Limak Energy Group, December, 2012)
  165. Aşkale Chrome and Magnesite Fields Preliminary Evaluation Report (Project Owner: Limak Energy Group, September, 2012)
  166. Technical Report Keles Coal Fields Resource Estimated Operation and Investment Costs (Project Owner: Limak Energy Group, October, 2012)
  167. Investigation of Open Mine Slope Stability for Keles – Harmanalani Lignite Field at the Technical Evaluation Phase (Project Owner: Limak Energy Group, October, 2012)
  168. Kangal Lignite Field Evaluation and Technical Report (Project Owner: Limak Energy Group, January, 2013)
  169. Evaluation of Exploration Potential of Sarıkız Chrome Quarry (Çayinli, Tomarza, Kayseri) (Project Owner, MADSAŞERENEREN Madencilik Sanayi ve Ticaret Ltd.Şti. June, 2013)
  170. Dombayova (Dinar, Afyonkarahisar) Coal License Field Resource Estimation Report (Project Owner, KLK Madencilik ve Elektrik Enerjisi A.Ş., December 2012)
  171. Dombayova (Dinar, Afyonkarahisar) Coal License Field Resource Estimate Update Report (Volume-1) (Project Owner, KLK Madencilik ve Elektrik Enerjisi A.Ş., December 2013) Updated Technical Report On The Coal Resources Of The Dombayova Property, Dinar, Afyonkarahisar , Turkey (Part-1)
  172. Dombayova (Dinar, Afyonkarahisar) Coal License Field Conceptual Quarry Design Report (Volume- 2) (Project Owner, KLK Madencilik ve Elektrik Enerjisi A.Ş., December 2013)
  173. Evaluation of Exploration Potential of Karaağaç (Sazak, Mihalıççık, Eskişehir) Chrome Field (Project Owner: Türk Maadin, April 2013, Ankara)
  174. Bolkardag Process Description (Co-created with Kappes, Cassiday and Associates), (Project Owner, Gumustas Madencilik, December, 2010)
  175. Chowdar Gold Property Crushing Plant Optimization Report, Project Owner: Chowdar Gold June 2013)
  176. Chowdar Gold Property, Khalnar Administrative District, Azerbaijan, Project Owner: Chowdar Gold March 2013)
  177. Dashkesen Iron Property, Azerbaijan Iron Processing Plant Action Report (Project Owner, Allenville Commodities Limited, Georgia, July 2012)
  178. Historical Mineral Resource Review And Update For The Northwestern And Southeastern Portions Of The Dashkesan Iron Property Ganja, Republic Of Azerbaijan (Principal Author and Competent Person Avrom E. Howard, MSc, FGA) , PGeo (Ontario))
  179. Independent Technical Review of Eti Gümüş Silver Mine Project Owner, Yıldızlar SSS Holding, March 2013)
  180. Geotechnical and Environmental Review of Eti Gümüş Silver Mine Gümüşköy, Kütahya, Turkey (Prepared by Prof. Dr. Caner Zanbak. February 2013)
  181. Investigation of Migem Contract Mining Licenses, (Project Owner, Abalıoğlu Holding, 2012)
  182. Review of Migem Contract Mining Licenses, (Project Owner, ALPATA Group Holding, 2013)
  183. Evaluation of Exploration Potential of License Area No. İR.69070 (Ece, Tefenni, Burdur) (Project Owner, Delta Star Petrol, April 2013)
  184. Evaluation of the Mining License Field No. 20066588 in the Eşlem Mountain Section (Yeşilova, Burdur) in terms of Chromium Potential (Project Owner: Alp Delimollaoğlu, September 2012)
  185. Sivas-Gölcük Copper Field Preliminary Operation Plan (Project Owner, Eurasia Mining, April 2012)
  186. AR: …-ER: Evaluation of Mining License Area No. … in terms of Gold-Silver Potential (Orhanlı, Balya, Balıkesir) (Project Owner: Metal Maden A.Ş.)
  187. Report on the samples collected from the borate deposits (Kirka, Emet, and Bigadiç) in western Turkey Daisuke Araoka1, Kyoko Yamaoka2, Yasushi atanabe2, *, and Hodaka Kawahata1 (June 2013)